From January to September 2026, PN’s Cesun Power distributed solar portfolio, about 15 MW across 10 rooftop projects, generated 12.01 GWh of clean electricity, avoided 3,809 tonnes of CO2 and qualified for 4,601 tradable green certificates. Third-quarter generation of 4.77 GWh was the strongest of the year, and 61.7% of nine-month output was consumed directly by the industrial facilities that host the systems. This issue sets out these results alongside the ESG governance framework adopted under Board Resolution No. 17, and fresh data from four solar markets.
This issue is built around ESG. Since the Board adopted Resolution No. 17 in July 2026, ESG work at PN has had a defined structure: Board-level oversight by the Nominating and Corporate Governance Committee, a CEO-chaired management Working Group, and a reporting approach based on GRI, SASB/ISSB and TCFD. The most direct way to show that structure at work is to report, consistently and month by month, what our operating assets actually deliver.
From January to September 2026, the Cesun Power distributed solar portfolio, about 15 MW across 10 rooftop projects, generated 12.01 GWh of clean electricity. That output avoided 3,809 tonnes of CO2, qualified for 4,601 tradable green certificates and saved 1,387 tonnes of standard coal. Third-quarter generation of 4.77 GWh was the strongest of the year, and September’s final settlement of 1.33 GWh replaced the forecast published in our last issue.
We also want to be clear about method. The station data calculates CO2 avoided and green certificates on grid-exported electricity only. Power consumed on site by host facilities, 61.7% of nine-month output, is not counted toward those two figures. This is a conservative basis, and it is why September’s actual CO2 figure (353 tonnes) is below the forecast figure (381 tonnes) even though generation came in higher.
Resolution No. 17 also sets the discipline for ESG reporting: disclosures are limited to actions taken and data measured, are reviewed by legal counsel, and contain no quantitative targets or net-zero pledges unless the Board has approved them in advance. Within that discipline, we will keep strengthening how we measure, review and report our ESG performance, and P4 sets out how the framework is organized.
Fiscal year 2026 ended on September 30, 2026, and full-year results will be reported in the Company’s annual report on Form 20-F. As always, every material development will reach shareholders through a periodic report or a Form 6-K first, and only then through this newsletter.
— PN Smart Energy Investor Relations
| Topic | Item | Page |
|---|---|---|
| ESG results | Clean energy, CO2, green certificates and on-site supply, January–September 2026 | P3 · P4 |
| ESG governance | Board oversight, management Working Group and reporting discipline under Resolution No. 17 | P4 |
| Operations | Month-by-month generation record; September actual settlement | P5 |
| Industry | China, U.S., Europe, and Singapore’s new 4 GWp-by-2035 solar target | P7 |
The portfolio generated 12.01 GWh from January to September 2026, with the third quarter the strongest at 4.77 GWh.
Quarterly generation rose from 2.74 GWh in Q1 to 4.50 GWh in Q2 and 4.77 GWh in Q3. September settled at 1.33 GWh (1,327,910 kWh), 8.7% above the forecast published in Vol.05.
January–September output avoided 3,809 tonnes of CO2 and qualified for 4,601 tradable green certificates, counted on grid-exported power only.
The same output saved 1,387 tonnes of standard coal. Both CO2 and certificates are calculated only on electricity exported to the grid, so on-site consumption is excluded from these figures.
Industrial host facilities consumed 7.41 GWh, or 61.7% of January–September output, directly on site.
The portfolio consists of rooftop systems on industrial facilities. Power used on site is settled with the host owner; the surplus is exported and settled with the State Grid. In September, the on-site share was 67.9%.
Metrics below are tracked under the ESG framework the Board adopted by Resolution No. 17 (July 7, 2026). All figures on this page are actual settled data.
The chart shows actual settled generation for each month of 2026 to date, with October shown as a model forecast. The figure under each month is actual generation as a percentage of the internal design model. September settled at 1.33 GWh, 8.7% above the forecast published in Vol.05; Q3 generation reached 107.5% of model.
| Period | Actual (MWh) | Design model (MWh) | % of model | On-site share |
|---|---|---|---|---|
| Q1 2026 (Jan–Mar) | 2,741 | 3,136 | 87.4% | 54.2% |
| Q2 2026 (Apr–Jun) | 4,503 | 4,558 | 98.8% | 61.8% |
| Q3 2026 (Jul–Sep) | 4,769 | 4,435 | 107.5% | 65.9% |
| January–September 2026 | 12,013 | 12,128 | 99.0% | 61.7% |
The most recent reported financial period is the six months ended March 31, 2026 (unaudited; Form 6-K, August 4, 2026). Fiscal year 2026 ended September 30, 2026.
| Item | Disclosed | Status per most recent disclosure |
|---|---|---|
| Limeon Digital Partners — AI O&M framework | Sep 23, 2026 | Framework only; plant locations, KPIs, timelines, and financial terms to be set in project-specific PIAs. |
| Zhejiang Yuntan — 9.9 MW portfolio | Aug 12, 2026 | Framework only; completion subject to due diligence, capacity verification, and a definitive equity transfer agreement |
| Nanjing Chenxi — ~200 MW sourcing | Aug 19, 2026 | Sourcing arrangement only; no commitment to acquire any specific asset; PN retains sole investment decision authority |
| Fiscal year 2026 | — | Ended September 30, 2026; full-year results to be reported in the annual report on Form 20-F |
| As of | Class A | Class B | Disclosure |
|---|---|---|---|
| Sep 30, 2025 · FY2025 year-end, pre-split | 13,975,000 | 13,025,000 | FY2025 20-F |
| Mar 31, 2026 · adjusted for 1-for-20 reverse split (effective Apr 13, 2026) | 1,286,775 | 1,251,250 | 6-K, Aug 4, 2026 |
| May 2026 · after Nanjing Cesun consideration shares and two PIPEs | 7,744,775 | 6,155,250 | 6-K, May 1 & May 6, 2026 |
| Aug 10, 2026 · after registered direct offering | 8,598,775 | 6,155,250 | 424B5, Aug 10, 2026 |
| Pro forma · if pre-funded warrants are exercised in full (+881,000 Class A) | 9,479,775 | 6,155,250 | 424B5, Aug 10, 2026 |
| Instrument | Status |
|---|---|
| F-3 Shelf Registration | $300M capacity, effective April 30, 2026 · first takedown Aug 10, 2026 ($5.205M gross) |
| PIPE Round 1 | $3.0M · 1,694,000 Class A shares · $1.77/share · lock-up ~Nov. 1, 2026 |
| PIPE Round 2 | $3.6M · 1,685,000 Class A shares · $2.14/share · lock-up ~Nov. 6, 2026 |
China — China added about 110 GW of new grid-connected solar in the first three quarters of 2026, of which 45.80 GW was utility-scale and 64.52 GW distributed; cumulative solar capacity reached 1,310 GW at the end of September, up 16.5% year over year (NEA press conference, October 30, 2026). pv magazine, citing NEA data, reports that nine-month additions were down 53.9% year over year against a 2025 base inflated by a pre-reform installation rush, but that third-quarter additions of about 38.76 GW were up about 38%, and September’s 13.64 GW was up about 41.2% (October 27, 2026). Distributed C&I activity continues: of 3,536 solar projects newly registered nationwide in September (excluding residential), 3,483 were C&I distributed (NEA notice, October 27, 2026).
United States — The U.S. installed 11.4 GWdc of solar in the second quarter of 2026, up 45% year over year, according to the SEIA/Wood Mackenzie U.S. Solar Market Insight Q3 2026. Utility-scale volume rose 61% and commercial solar 11%, while residential and community solar declined. Solar’s share of new generating capacity fell from 51% in 2025 to 45% in the first half of 2026, as wind additions rose (pv magazine USA, September 10, 2026). Cumulative U.S. solar capacity reached 299.4 GW (pv magazine USA, September 21, 2026).
Europe — In the second quarter of 2026, European solar generation exceeded its previous record by nearly 20%, and recurring midday surpluses produced 596 hours of negative prices in Spain, 462 in Portugal, 370 in France and 317 in Greece (Montel, European Power Market Outlook Q3 2026, via pv magazine, October 6, 2026). For full-year 2025, EU solar generated a record 369 TWh, 13% of EU electricity and higher than coal and hydro; wind and solar together (30%) exceeded fossil generation (29%) for the first time (Ember, European Electricity Review 2026, January 22, 2026).
Southeast Asia · Singapore — Singapore reached its original target of 2 GWp of solar by 2030 ahead of schedule and raised it to 3 GWp by 2030 (Energy Market Authority). In late October, the EMA said Singapore now has 2.3 GWp of solar in operation and set a new target of 4 GWp of cumulative solar capacity by 2035; a new EMA tender for the solarisation of public premises was also announced (PV Tech, October 28, 2026). PN Sunshine Pte. Ltd., the Company’s Singapore-registered subsidiary, is based in this market.
| IR Contact | T.T. Cai, Investor Relations |
| IR Email | ir@pnsmartenergy.com |
| IR Phone | +1 574 575 7170 |
| External IR | WFS Investor Relations Inc. (Connie Kang, Partner) — ckang@wfsir.com |
| IR Website | ir.pnsmartenergy.com |
| Ticker | NASDAQ: PN |
| SEC File No. | 001-42544 |
| Auditor | Enrome LLP (Singapore, PCAOB-registered) |
| Listing Date | March 4, 2025 |
| Legal Entity | PN Smart Energy Limited (formerly Skycorp Solar Group Limited) |
| Rename Effective Date | June 12, 2026 (Cayman Islands Registrar of Companies) |
| All Filings | SEC EDGAR · File No. 001-42544 |
This document contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. These statements involve known and unknown risks, uncertainties, and other factors which may cause the Company’s actual results, performance, or achievements to be materially different from any future results, performances, or achievements expressed or implied by the forward-looking statements. The Company undertakes no obligation to update or revise any forward-looking statements after the date of this document.
Any generation figure identified as a forecast, including the October 2026 figure on P5, is a model-based estimate subject to final grid-settlement data and may differ materially from actual results. Comparisons with the internal design model describe historical performance only and do not indicate future generation. Statements regarding the Framework Cooperation Agreement with Limeon Digital Partners, the proposed Yuntan portfolio acquisition, the Nanjing Chenxi sourcing framework, the 1 GW five-year clean-energy target, and the ESG reporting framework are statements of current strategic direction and do not constitute a commitment to complete execution by any specific date or on any specific terms. The Limeon agreement is a framework agreement only, subject to subsequent Project Implementation Agreements; the Yuntan transaction remains subject to due diligence, capacity verification, and a definitive equity transfer agreement. Government targets cited on P7 are third-party policy targets, not Company forecasts. Factors that could cause actual results to differ are discussed in the Company’s SEC filings, including its annual report on Form 20-F.
Not Investment Advice. This document is for informational purposes only and does not constitute investment advice or a solicitation to buy or sell securities. All information in this document is based on publicly available SEC filings, third-party industry data, and company-authorized materials identified in the Data Sources section below. Past performance is not indicative of future results.
Data Sources. FY2025 20-F (Feb 12, 2026); 6-K filings (Apr 28/30, May 1/6, Jun 30, Jul 30, Aug 4/7/10, 2026); Form 424B5 (Aug 10, 2026); F-3 (filed Apr 28, effective Apr 30, 2026); Board Resolution No. 17 (Jul 7, 2026); Board Resolution No. 17 Exhibits A and B; press releases, Aug 12, Aug 19, and Sep 23, 2026; Cesun Power station-data summaries, January–September 2026 (actual settlement) and October 2026 (forecast); Cesun Power 2026 annual generation summary. Industry data: NEA press conference transcript (Oct 30, 2026) and notice on September 2026 newly registered projects (Oct 27, 2026); pv magazine (Oct 6 and Oct 27, 2026); pv magazine USA (Sep 10 and Sep 21, 2026), reporting SEIA/Wood Mackenzie, U.S. Solar Market Insight Q3 2026; Montel, European Power Market Outlook Q3 2026; Ember, European Electricity Review 2026 (Jan 22, 2026); Energy Market Authority of Singapore (solar page, updated Sep 10, 2026); PV Tech (Oct 28, 2026). Compliant with SEC Reg FD. Photography: Cesun Power rooftop projects (Company disclosure). P7 regional map is an illustrative graphic, not to scale.